Major carbon dioxide pipeline enters operation in Jilin

An aerial view of the CCUS project in Jilin. [Photo/Cailian News]
A major carbon capture, utilization, and storage (CCUS) project linking China National Petroleum Co (CNPC)'s Jilin Petrochemical Branch and Jilin Oilfield Branch began operation on Nov 16, marking new progress in large-scale carbon dioxide transportation and utilization in China.
Stretching 277.6 kilometers across Jilin, Changchun, and Songyuan, the pipeline connects a carbon dioxide capture facility at Jilin Petrochemical with oil recovery and storage operations at Jilin Oilfield.
With a maximum diameter of 610 millimeters and a designed pressure of 14.5 megapascals, it can transport 3.3 million metric tons of carbon dioxide annually, making it China's longest, largest-diameter, and highest-pressure long-distance carbon dioxide pipeline.
As a key project in CNPC's CCUS development in Northeast China, the pipeline creates an integrated chain for carbon capture, transportation, utilization, and storage. Captured industrial emissions can be used for enhanced oil recovery while being stored underground, supporting both emissions reduction and oil production.
The project, which overcame technical challenges involving carbon dioxide phase control, pipeline corrosion, and high-pressure transportation, also uses renewable electricity and a digital monitoring system covering 16 valve stations to support safer, lower-carbon operations.
