Home>Investment>Biz Updates

FAWDE Changchun super plant commences production

gojilin.gov.cn | Updated: December 28, 2023
  L M S

微信图片_20231228100624_副本.jpg

The FAWDE Changchun super plant. [Photo provided to gojilin.gov.cn]

The launching ceremony for the FAWDE Changchun super plant took place on Dec 27, which also marks the start of G Power Field's upgraded lightweight 440 axle production.

Covering an area of 72,000 square meters, the super plant has a total investment of 989 million yuan ($139 million) and possesses the production capacity for assembling and painting 320,000 sets of drive axles. 

During the construction of the production line, various energy-saving, environmental protection, and energy management technologies were utilized to ensure a green and environment-friendly manufacturing process.

The overall maturity level of the plant's intelligent manufacturing reached Level 3, with certain areas reaching Level 4. This enables seamless human-machine-object connectivity and intelligent decision-making upgrades. The total efficiency of the production line ranks first in the industry, making production more automated and logistics more efficient.

微信图片_20231228100628_副本.jpg

The FAWDE Changchun super plant. [Photo provided to gojilin.gov.cn]

The upgraded lightweight 440 drive axle produced by the plant achieves industry-leading performance in fuel efficiency and reliability. It also features a lightweight design, an oil change cycle, and low noise when in operation.

This product will only need an oil change at 800,000-kilometer intervals, and is more than 101 kilograms lighter in weight when compared to similar competing products. The drive axle boasts a maximum transmission efficiency of 99 percent, a comprehensive efficiency of 98.11 percent, a B10 life of 2 million kilometers, and a noise level that is 3 decibels lower than the industry standard.